Underground 10/3 UF Feeder Trenching and Installation in Union, SC
Touchstone Electric completed a code-compliant underground feeder installation for Patrick Mornane in Union, SC. Dispatched from our Greenville branch in Taylors, technician Tyler Harris wrapped this project on April 23, 2026, delivering a clean, reliable path for a new 30-amp circuit.
- Service categories: Panels & Service Upgrades; Subpanel Installation
- Scope: Approximately 75 ft of trenching and 80 ft of 10/3 UF direct-burial cable
- Depth: Code-compliant 24 in. burial for direct-burial installation
- Circuit rating: 30A feeder-ready run
Project overview
This job called for a durable underground feeder to support a 30-amp circuit—ideal for small subpanels, detached structures, or equipment that benefits from a dedicated run. Our team completed professional trenching, placed the cable to the correct depth, and ensured the path was prepared for final terminations by the homeowner’s selected equipment.
- Trenching: Approximately 75 feet, prepared to meet the minimum 24-inch burial requirement for direct-burial cable.
- Feeder: 80 feet of 10/3 UF direct-burial cable installed for a 30A circuit.
- Equipment: Purpose-built trencher utilized to complete the excavation efficiently and neatly.
Per the defined scope, this installation did not include a breaker, posts, or any receptacle/switch/fixture installation. If you need a complete end-to-end solution, we can provide a tailored quote that includes these components and any required terminations.
Code-compliant depth and safety
For direct-burial underground feeders, a minimum 24-inch burial depth is required in most residential scenarios. This project was executed to meet that standard. When rigid metal conduit is used, certain exceptions may apply, but for UF cable direct burial in Union, SC, the 24-inch standard is the typical benchmark for safety and code compliance.
Before any digging, remember to call 811 to have utilities located. It’s free, it’s the law, and it keeps your property and our technicians safe. Touchstone Electric always encourages homeowners to complete utility locates prior to trenching so the work can proceed without delays or hazards.
Why Union homeowners choose Touchstone Electric
- Local expertise: Serving Union, SC and the surrounding Upstate communities from our Greenville branch in Taylors.
- Feeder and subpanel know‑how: Experienced with underground runs for 30A circuits and subpanel-ready feeders.
- Clean, careful trenching: Purpose-built equipment and a methodical approach to protect landscaping as much as possible.
- Clear scope and options: Transparent deliverables with add-on services available upon request.
After completion, Patrick Mornane shared positive feedback about the experience—thank you for trusting Touchstone Electric for your underground feeder project in Union.
Planning an underground feeder or subpanel in Union, SC?
If you’re adding a detached structure, upgrading equipment, or preparing for a future subpanel, a properly sized and installed underground feeder is essential. Our licensed electricians can help you select the right cable size, trenching approach, and protective measures to align with local code and your long-term plans.
- Assessment of distance, load, and routing to determine the right feeder approach
- Code-compliant trenching and burial
- Options for conduit, equipment terminations, and panel/breaker upgrades when needed
Contact Touchstone Electric to schedule a site visit or request a detailed estimate for your underground feeder or subpanel project in Union, SC.