Level 2 EV Charger Upgrade & Installation in Charlotte, NC completed by Touchstone Electric
Completed Project

Level 2 EV Charger Upgrade & Installation in Charlotte, NC

EV Charging completed by Touchstone Electric in Charlotte.

CharlotteCompleted: June 10, 2025
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Touchstone Electric’s Charlotte branch (based in Matthews) recently completed a Level 2 EV charger upgrade and installation in Charlotte, NC for Duke Energy - Allumia. Our licensed technician, Patrick Burke, replaced an older charger with an upgraded Level 2 unit on a dedicated circuit to support faster, more reliable home charging. This project was completed on June 10, 2025 with full attention to safety, code compliance, and a clean, professional finish.

About this Level 2 EV Charger Upgrade

Our team removed the existing charger and installed an upgraded Level 2 unit with a new, properly sized circuit to match the manufacturer’s specifications. The new setup is designed for dependable daily charging while protecting the home’s electrical system and the vehicle’s onboard charger.

What We Installed

  • Charger upgrade: Replaced the legacy unit with a customer-supplied Level 2 EV charger and completed a full start-up and commissioning.
  • Dedicated 60A breaker: Installed a correctly rated breaker in the main service panel for consistent performance and headroom.
  • New conductors: Pulled THHN #4 copper conductors for a robust, low-resistance feeder to the charger location.
  • Protected raceway: Ran approximately 1-inch PVC conduit for a neat, durable, and code-compliant pathway.
  • Electrical permit: Filed and closed the county electrical permit for code-compliant installation and inspection.
  • Appliance integration: Properly hard-wired or connected the charger per listing and manufacturer guidelines.

Every connection was torque-verified, labeling was updated, and the charger was function-tested under load to confirm safe operation.

Permitting and Code Compliance

We secured the required electrical permit and completed the installation to current electrical code and local requirements in Charlotte, NC. If a future project requires non-electrical permits (for example, historic, environmental, or zoning approvals), those are handled separately; our team can advise you on next steps to keep your project moving smoothly.

Duke Energy EV Rebate Assistance

To help lower project costs, our team assisted with the Duke Energy EV rebate. We provided documentation and installation details so the customer could take advantage of available incentives. If you’re upgrading to a Level 2 charger in the Charlotte area, ask us how current utility rebates and programs may apply to your project.

Results for the Home and Vehicle

  • Faster daily charging: A dedicated Level 2 circuit delivers reliable power for overnight or quick top-ups.
  • Cleaner installation: Conduit and wire management for a tidy appearance and long-term durability.
  • Future-ready capacity: Properly sized wiring and breaker support sustained performance and potential future needs.
  • Peace of mind: Permit-backed, inspected work completed by a licensed electrician.

Customer Feedback

We’re proud to share that Duke Energy - Allumia praised our Charlotte team with a positive review. Read it here: View the Google review.

Serving Charlotte, NC

From our Matthews location, Touchstone Electric’s Charlotte team delivers expert EV charging and Level 2 EV charger installation services across Charlotte, NC. Whether you’re replacing an older charger or installing a new unit for the first time, we handle load calculations, dedicated circuits, conduit routing, permitting, and start-up so you can charge with confidence.

Thinking about a Level 2 charger upgrade? Reach out to our Charlotte team to discuss your home, panel capacity, and the best path to a safe, efficient installation.