Project Overview
Relocated a Level 2 EV charging receptacle left of the panel with new 6/3 wiring and 3/4 EMT conduit in Apex, NC for safer, code-compliant charging.
Customer feedback: Brad just left our house and I couldn't get to my computer fast enough to write this review. I had our normal company come out earlier to give a quote on moving a 240V outlet I use for my EV and almost canceled my quote with Touchstone and I am so glad I didn't. Brad found a problem in the electrical panel that was visible to even me that would have potentially caused a electrical fire. The other company didn't even look in the panel. I am so grateful he was so thorough with his inspection and took care of that issue. He was a joy to have in my home and was able to fix a switch in the home where the other company originally said it was a bulb until I told them that wasn't the case. Touchstone and Brad as long as he is there will be our go to electricians going forward. Looking forward to having him back to complete the EV work as soon as we can get it scheduled.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Apex area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on June 20, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 1 project photo attached to this completed job.