Level 2 EV Charger NEMA 14-50 Outlet Installation in Charlotte completed by Touchstone Electric
Completed Project

Level 2 EV Charger NEMA 14-50 Outlet Installation in Charlotte

EV Charging completed by Touchstone Electric in Charlotte.

CharlotteCompleted: May 23, 2025
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Project overview

Our Charlotte team, based out of our Matthews branch, completed a Level 2 EV charging upgrade for Duke Energy - Allumia in Charlotte, NC. On May 23, 2025, technician Chris Rogers installed a dedicated NEMA 14-50 outlet and coordinated the Duke Energy EV rebate to help reduce the customer’s out-of-pocket cost.

The customer praised our team with a review following the installation.

What we installed

  • NEMA 14-50 receptacle dedicated for a Level 2 EV charger
  • 10 ft of 6/3 cable to support a 50-amp circuit
  • 10 ft of wire fishing through finished areas for a clean look
  • 50A double‑pole CH breaker for safe, reliable charging
  • Electrical helper on site to ensure an efficient, tidy install

We verified proper grounding, torque, and polarity, then tested the outlet under load to confirm safe operation for Level 2 charging.

Why choose a NEMA 14-50 for Level 2 charging?

  • Faster charge times compared to standard 120V outlets
  • Wide compatibility with many EV mobile connectors and plug-in EVSEs
  • Future-ready capacity with a dedicated 50A circuit and 6/3 conductors
  • Code‑compliant installation for safety and peace of mind

For many homeowners and fleet managers in Charlotte, a properly installed NEMA 14-50 is a smart, cost-effective way to enable dependable Level 2 charging at home or work.

Duke Energy EV rebate assistance

To help maximize savings, Touchstone Electric processed the permit and coordinated the Duke Energy EV rebate for this installation. Below is a summary of the provided rebate breakdown:

  • Subtotal: $1,217.04
  • Permit: $65.00
  • Total material/labor (excluding permit): $1,152.04
  • Materials: $460.82
  • Labor: $691.22
  • Items not covered by rebate: $0.00
  • Duke Energy rebate applied: $1,133.00
  • Estimated homeowner out‑of‑pocket + tax: $84.04

Our team stays current with Charlotte permitting and utility rebate programs to streamline your project from start to finish.

How we deliver a smooth EV charging upgrade

  • Site and panel assessment: We evaluate panel capacity and choose the best location for your EV outlet or hardwired charger.
  • Clear plan and permit: We pull the necessary permit and outline the scope before work begins.
  • Neat installation: Short cable runs and professional wire fishing keep the finished look clean.
  • Testing and verification: We meter, label, and test the circuit to confirm safe, reliable performance.

Whether you’re adding your first EV or upgrading capacity, we tailor each installation to your vehicle, charger, and charging habits.

Serving Charlotte, NC

Touchstone Electric proudly provides EV charging installations throughout Charlotte, NC. From our Matthews branch, our Charlotte electricians deliver prompt, code‑compliant service for homeowners, builders, and local businesses adding Level 2 charging.

Planning a Level 2 EV charger or NEMA 14-50 outlet in Charlotte? Our team can assess your panel, manage permits, and guide you through available utility rebates to help you charge faster and smarter at home.