Level 2 EV Charger Installation in Charlotte, NC
Touchstone Electric’s Charlotte team (based out of our Matthews branch) completed a permitted Level 2 EV charger installation for Duke Energy - Allumia on November 4, 2025. Lead technician Mark Viktorovich handled the project from permitting to final testing, delivering a safe, code-compliant charging solution tailored for residential use in Charlotte, NC.
Project overview
This installation provided a dedicated, high-capacity EV charging circuit designed for reliable overnight charging and long-term performance. We focused on proper load management, clean routing, and documentation to support the homeowner’s eligibility for the Duke Energy EV rebate.
- Dedicated 240V, 60A circuit: Installed a new 60-amp breaker in the main service panel exclusively for the EV charger.
- New 6/2 NM-B wiring: Ran appropriately sized 6 AWG conductors for the circuit. Where the route required protection, we transitioned to conduit for durability and code compliance.
- Charger connection: Safely connected the customer-supplied Level 2 EV charger per manufacturer instructions and National Electrical Code requirements.
- Labeling and documentation: Updated the panel directory and applied clear EV circuit labeling for quick identification and future service.
- Testing and verification: Verified torque on terminations, polarity, grounding, and proper operation of the new circuit.
Permitting and inspection
Our team pulled the required permit for this EV installation in Charlotte and coordinated the inspection process. We performed a residential load assessment to confirm panel capacity, planned the circuit route for accessibility and protection, and prepared all documentation needed for final inspection. This ensures the installation aligns with North Carolina Electrical Code and NEC Article 625 for Electric Vehicle Supply Equipment.
Duke Energy EV rebate assistance
To support the customer’s eligibility for the Duke Energy EV charger rebate, we provided the necessary permit details and installation documentation. Program requirements can evolve, and our Charlotte branch stays current so homeowners can confidently pursue available incentives without hassle.
Why this setup works for Charlotte homeowners
- Faster Level 2 charging: A dedicated 60A, 240V circuit enables efficient overnight charging for most EVs.
- Future-ready capacity: 6/2 NM-B and a 60A breaker provide headroom for many Level 2 chargers and potential future upgrades, subject to charger specifications and code.
- Safety by design: Properly sized conductors, secure mounting, and clear labeling reduce heat buildup, nuisance tripping, and confusion in the panel.
Why choose Touchstone Electric in Charlotte
- Local expertise: Our Matthews-based Charlotte team specializes in residential EV charging solutions throughout the Charlotte, NC area.
- Code-first approach: We follow NEC requirements and local amendments for safe, compliant installations.
- End-to-end service: Site assessment, permitting, installation, testing, and rebate documentation—all handled by our in-house electricians.
- Clean, respectful work: We protect your home, maintain a tidy workspace, and leave the area clean when we’re done.
- Clear communication: You’ll know what we’re installing, why it’s required, and the steps we take to meet code and rebate criteria.
Customer feedback
After the installation, the customer praised our team with a positive review highlighting the smooth permitting process and professional workmanship.
Planning an EV charger in Charlotte, NC?
If you’re ready for faster, safer home charging, our Charlotte branch is here to help. We’ll confirm panel capacity, handle the permit, install a dedicated circuit with the correct wire size and breaker, and provide documentation to support available incentives. Contact Touchstone Electric to schedule your Level 2 EV charger installation in Charlotte.
