Level 2 EV Charger Installation with Duke Rebate in Wade Hampton, SC completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation with Duke Rebate in Wade Hampton, SC

EV Charging completed by Touchstone Electric in Wade Hampton.

Wade HamptonCompleted: June 8, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Level 2 EV Charger Installation in Wade Hampton, SC

Touchstone Electric’s Taylors branch completed a Level 2 EV charger installation for Duke Energy - Allumia in the Wade Hampton service area on June 8, 2026. Led by technician Cash Divver, this project delivered a safe, code-compliant charging solution with full permitting and rebate guidance through Duke Energy’s program.

Our team provided a dedicated 240V circuit, installed cleanly in PVC conduit with THHN wiring, and ensured the customer’s charger was set up correctly for reliable everyday use.

What We Installed

  • Dedicated 40A circuit to power the Level 2 EV charger and protect sensitive electronics.
  • New 40A breaker installed in the existing electrical panel for a dedicated charging line.
  • THHN #8 wiring pulled in 3/4-inch PVC conduit for durability and a tidy appearance.
  • Customer-supplied EV charger mounted and connected per manufacturer specifications.
  • Permitting and inspection handled to meet local and state electrical code requirements.
  • System testing and labeling to verify proper operation and make future maintenance simple.

This setup delivers faster charging speeds than standard outlets while maintaining strong safety margins and long-term reliability.

Duke Energy Rebate Guidance

We helped the customer navigate the Duke Energy rebate process by confirming eligibility, documenting the installation, and providing the information typically required for reimbursement. Our team regularly works within utility rebate programs, making it easier for Wade Hampton and greater Greenville residents to reduce out-of-pocket costs for qualified EV charger installations.

Safety, Code, and Workmanship

Every EV charging project we complete is permitted and installed to current electrical codes. For this job, our crew routed a neat conduit run, protected conductors with PVC, secured terminations, and verified breaker sizing for the charger’s demand. The result is a safe, efficient charging solution that’s inspection-ready and built to last.

Project Details at a Glance

  • Service type: Level 2 EV Charger Installation
  • Location: Wade Hampton, SC (serviced by our Taylors/Greenville team)
  • Completion date: June 8, 2026
  • Technician: Cash Divver
  • Customer: Duke Energy - Allumia
  • Materials used: New 40A breaker, THHN #8 conductors, 3/4-inch PVC conduit
  • Approximate runs: About 20 ft of conduit and 25 ft of THHN wiring
  • Permit: Obtained and included as part of the installation

Customer Feedback

Following completion, the customer praised our team with a positive review of the installation. We appreciate the feedback and remain committed to delivering dependable, rebate-ready EV charging solutions across Wade Hampton and the Greenville area.

Considering a Level 2 Charger in Wade Hampton?

Whether you’re upgrading from a standard outlet or setting up your first home charger, Touchstone Electric can help you choose the right circuit size, complete a clean installation, pull permits, and guide you through available rebates. Our Taylors branch proudly serves Wade Hampton and the broader Greenville community with safe, professional EV charging installs.

Reach out to schedule your assessment and get a code-compliant, utility-rebate-ready Level 2 charger installation.