Level 2 EV Charger Installation with 60A Circuit in Charlotte completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation with 60A Circuit in Charlotte

EV Charging completed by Touchstone Electric in Charlotte.

CharlotteCompleted: December 2, 2025
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Level 2 EV Charger Installation in Charlotte, NC

On December 2, 2025, our Charlotte team completed a customer‑supplied Level 2 EV charger installation for Duke Energy - Allumia. The project was handled by technician Chris Rogers and dispatched through our Matthews branch to serve the greater Charlotte area.

This service included a new dedicated 240V, 60‑amp circuit with a Siemens breaker, properly sized conductors, permitting, and guidance on utility rebates to help the customer take advantage of available incentives.

What We Installed and Why

  • 60A Siemens breaker: Provides a reliable, dedicated supply to meet the charger’s continuous load requirements.
  • 15 ft of #6 SEU (3‑wire) feeder: Correctly sized conductors for a 60‑amp EV charging circuit, ensuring safe, efficient power delivery.
  • Customer‑supplied Level 2 charger setup: Professionally mounted and connected to the new circuit during a single visit.
  • Permit and coordination: We pulled the required Duke permit and coordinated all compliance steps for a smooth, code‑compliant installation.

The result is a dependable Level 2 charging solution that supports faster charging times and long‑term performance for daily use.

Safe, Code‑Compliant Electrical Work

EV charging circuits operate continuously at higher loads, so proper design and installation are essential. Our team:

  • Installed a dedicated 240V/60A circuit to prevent nuisance tripping and protect other home circuits.
  • Used #6 SEU conductors to match the breaker and anticipated load, with correct terminations and torque at the panel.
  • Ensured proper labeling and clear workspace at the service equipment for future maintenance and inspections.

These steps align with local code and manufacturer best practices, helping maximize charger lifespan and household electrical safety.

Permitting and Duke Energy Rebate Support

Touchstone Electric managed the permitting from start to finish, keeping the project on schedule and inspection‑ready. Because this project was completed under the Duke Energy program, we also guided the customer through the EV rebate process.

Our detailed documentation and itemized scope (including the breaker, wiring, and installation labor) made it straightforward for the customer to submit and track their rebate. By handling the paperwork and providing clear cost breakdowns, we helped reduce out‑of‑pocket expenses and accelerate reimbursement.

Project Highlights

  • Level 2 charger integrated on a reliable 60A circuit for faster, consistent charging.
  • Professional installation by a Charlotte‑based team with local code expertise.
  • Permit pulled and inspection coordination handled by Touchstone Electric.
  • Rebate guidance to help the customer maximize available incentives.

Reviewed by the Customer

Our work on this Charlotte installation earned positive feedback. See the customer’s review on Google: Read the review.

Serving Charlotte and the Surrounding Area

From our Matthews branch, Touchstone Electric provides EV charging solutions across the Charlotte, NC area. Whether you have a charger ready to install or need help selecting the right unit, our team can design a code‑compliant circuit, pull the necessary permits, and guide you through any available rebates.

Need a Level 2 EV charger installation in Charlotte? Our local electricians are ready to help with dedicated circuits, panel work, and safe, professional wiring tailored to your home and vehicle.