Level 2 EV Charger Installation in Charlotte
Touchstone Electric’s Charlotte team completed a turnkey Level 2 EV charger installation for Duke Energy - Allumia in Charlotte. Led by technician Chris Rogers, this project delivered a dedicated 60-amp circuit to power a customer-supplied Level 2 charger—installed with a permit and set up to qualify for the Duke Energy EV rebate. Completed on August 14, 2026, the job was handled by our Charlotte branch based in Matthews and serves as a great example of safe, efficient home EV charging done right.
What We Installed
- 60A Square D breaker added to the customer’s panel to provide a dedicated charging circuit.
- #6 stranded conductors (approximately 25 ft) sized for a 60-amp EV charging load.
- #6 SEU cable (approximately 10 ft) to complete the run as needed for the final connection.
- 3/4" PVC conduit (approximately 25 ft) with fittings and supports for a protected, tidy cable pathway.
- Installation of customer-supplied Level 2 charger—mounted, connected, and made ready for charging.
- Permit obtained and documentation coordinated for the Duke Energy EV rebate.
This configuration provides robust, reliable power delivery for faster Level 2 charging while maintaining a clean, professional appearance with properly supported conduit and neatly routed wiring.
Why a 60-Amp Circuit for Level 2 Charging?
A dedicated 60-amp circuit allows many Level 2 chargers to operate at up to 48 amps continuous output, offering significantly faster at-home charging compared to lower-amperage circuits. It’s a future-ready choice that supports overnight refueling for most EVs and helps minimize charging time, especially for larger battery packs.
Using heavy-gauge conductors and quality components—like the Square D breaker installed on this project—supports dependable performance and long-term safety for daily charging.
Permits and Duke Energy Rebate Support
Permitting matters for safety and compliance. For this Charlotte installation, our team handled the permit and coordinated the documentation needed for the Duke Energy EV rebate. If you’re in the Charlotte area, we can help you navigate available incentives to reduce out-of-pocket costs for your home charging upgrade.
Rebate programs and eligibility can change, so our team stays current to help you make the most of available options when you go electric.
Project Highlights
- Dedicated 60A EV charging circuit installed for dependable Level 2 performance.
- Neat, durable 3/4" PVC conduit routing and properly sized #6 wiring.
- Integration of a customer-supplied Level 2 charger for a cost-effective solution.
- Permit obtained and rebate guidance provided to streamline the process.
- Completed by our Charlotte branch (Matthews) for a local Charlotte customer.
Serving Charlotte With Local EV Charging Expertise
Touchstone Electric’s Charlotte branch proudly serves homeowners throughout Charlotte and nearby communities from our Matthews location. Whether you’re installing your first EV charger or upgrading to a higher-amperage circuit, our team can deliver a clean, professional installation that fits your home, panel, and parking layout.
Every home is different, and we tailor each installation to your unique setup. From the breaker and wiring to conduit paths and charger placement, our goal is a safe, efficient, and convenient charging solution you can count on day after day.
Ready for a Level 2 Charger in Charlotte?
If you’re considering a Level 2 EV charger, we can help you plan the right circuit size, coordinate the permit, and provide guidance on rebates available in the Charlotte area. Talk with our Charlotte team about your goals, charger model, and parking location, and we’ll design a solution that works for you.
Contact Touchstone Electric—Charlotte—for professional, local EV charging installations that make home charging fast, reliable, and convenient.