Touchstone Electric recently completed a professional Level 2 EV charger installation for Duke Energy - Allumia in Huntersville, NC. Performed by technician Christian Cedillos from our Charlotte team based out of Matthews, this project was finished on January 20, 2025 and included a permitted, code-compliant 50-amp circuit dedicated to EV charging.
What we installed for this Level 2 EV charger
- Dedicated 50A GFCI breaker: A 50-amp GFCI breaker was installed to protect the EV charging circuit and meet current safety standards for garage and vehicle-charging locations.
- THHN #6 copper wiring: Approximately 12 feet of THHN #6 conductors (3–4 strand as appropriate) were pulled for a robust, high-capacity circuit.
- 1-inch EMT conduit: About 12 feet of 1-inch EMT metallic conduit with proper fittings and supports to protect and route conductors cleanly and safely.
- Appliance hookup for the customer-supplied charger: Connection of the EVSE with the appropriate receptacle or hard-wired configuration to manufacturer specifications.
- County electrical permit: We filed the electrical permit and completed the work to pass inspection requirements.
This setup delivers reliable Level 2 charging performance for today’s EVs while providing capacity for many future models.
Safety and compliance you can count on
Every EV charger we install is sized to the load, protected by the correct overcurrent device, and routed in durable conduit with properly rated conductors. Including a GFCI breaker enhances personal protection, and using EMT with THHN #6 conductors ensures a neat, serviceable installation designed for long-term reliability. With a permitted project, homeowners in Huntersville benefit from documented compliance and peace of mind.
Duke Energy EV rebate applied to this project
This installation qualified for a Duke Energy EV rebate as documented for the project. Cost details recorded for this job included:
- Subtotal: $1,440.04
- Permit: $65.00
- Total material/labor (excluding permit): $1,375.04
- Materials: $550.02
- Labor: $825.02
- Items not covered by rebate: $0.00
- Duke Rebate: $1,133.00
- Homeowner out of pocket + tax: $307.04
Rebate eligibility and amounts vary by utility program and customer qualification; we’re happy to help you understand current options in Huntersville and greater Charlotte.
Permit note
This project included filing the county electrical permit. Some jurisdictions may require additional non-electrical permits (for example, historic preservation, environmental/septic, zoning, or builder-related permits). These are not included by default. If additional permits are required, we’ll advise you on next steps and can provide pricing to process them if needed.
Local expertise for Huntersville homeowners
- Installed by our Charlotte team serving Huntersville from our Matthews branch
- Licensed, permitted work that prioritizes safety and code compliance
- Clean, organized conduit runs and properly sized conductors for dependable charging
- Familiar with utility incentives and EV charger manufacturer requirements
Whether you need a NEMA receptacle for a portable EVSE or a hard-wired Level 2 station, we tailor each installation to your panel capacity, charger specs, and parking layout.
Customer feedback
Our customer praised our team with a positive review. Read it here: View on Google
Planning a Level 2 charger in Huntersville?
Touchstone Electric makes it straightforward: we evaluate your electrical system, size the circuit, provide a clean, professional installation, and help you navigate permits and rebates. If you’re in Huntersville or the greater Charlotte area, reach out to schedule your EV charging upgrade.