Level 2 EV Charger Installation with 50A Circuit in Charlotte completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation with 50A Circuit in Charlotte

EV Charging completed by Touchstone Electric in Charlotte.

CharlotteCompleted: July 24, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Professional Level 2 EV Charger Installation in Charlotte

Touchstone Electric’s Charlotte branch, based in Matthews, completed a permit-ready Level 2 EV charger installation in Charlotte for Duke Energy - Allumia on July 24, 2026. Our licensed electricians, Mark Alaev and Dillon Culley, installed a Grizzl-E Level 2 charger with a dedicated 50-amp circuit, delivering safe, reliable home charging performance.

If you need an EV charger installed in the Charlotte area, our team provides code-compliant workmanship, clean routing, and clear communication from start to finish.

Scope of Work Completed

  • Charger: Customer-supplied Grizzl-E Level 2 EV charger, professionally mounted and terminated.
  • Dedicated Circuit: New 240V, 50-amp circuit with a standard 50A breaker installed in the service panel.
  • Conductor Pull: THHN #6 conductors routed for dependable, high-capacity charging.
  • Exterior Conduit: 3/4" PVC conduit neatly run along the outside of the home to the back side for a clean appearance and durability.
  • Wall Penetration: Professional wall punch-through to bring conductors into the charging location, then final terminations at the EVSE.
  • Permit-Ready: Installation prepared for inspection with documentation aligned to local requirements.

Every step of this project was completed to manufacturer specifications and local electrical code to ensure safe operation and long-term reliability.

How We Install Level 2 Chargers in Charlotte

Our process is designed to minimize disruption while delivering a tidy, dependable result:

  • Plan the route for exterior PVC conduit to protect conductors and maintain curb appeal.
  • Create a precise wall penetration to reach the charging location without unnecessary openings or patchwork.
  • Install a dedicated 50A breaker and pull appropriately sized conductors for the EV load.
  • Mount and wire the EVSE, then test the circuit and charger functions before we wrap up.

The result is a clean, code-compliant installation that’s ready for inspection and daily use.

Why a 50-Amp Level 2 Charger?

  • Faster charging: Level 2, 240V power dramatically reduces charge time compared to a standard 120V outlet.
  • Dedicated capacity: A dedicated 50-amp circuit helps ensure safe, consistent charging without overloading other household circuits.
  • Future-ready: Supports a wide range of current EVs and many future models.
  • Everyday convenience: Wake up to a reliably charged vehicle—no public charging detours required.

Local Pros Serving Charlotte

From our Matthews-based Charlotte branch, Touchstone Electric provides EV charger installations across Charlotte. We deliver neat conduit runs, precise terminations, and panel work handled by licensed electricians who know local code and inspection requirements.

We also support utility incentive documentation when applicable, helping homeowners and partners streamline the process for eligible EV programs.

Customer Feedback

Duke Energy - Allumia praised our team for this installation. You can view their feedback here: Read the Google review.

Get Your Charlotte EV Charger Installed

Ready to add a Level 2 charger to your home in Charlotte? Our team handles everything from the panel work and conduit routing to final EVSE wiring and testing. Contact Touchstone Electric’s Charlotte branch to schedule your installation and enjoy faster, safer home charging.