Project Overview
Residential Level 2 EV charger install in Morrisville, NC, with permit, 3/4" EMT conduit, #6 THHN for a 60A circuit, and guidance on the Duke Energy EV rebate.
Customer feedback: Patrick Burke (and Mann) did a great job installing a new circuit breaker panel & new outlet for a crawl space dehumidifier! They were knowledgeable, polite & thorough. I will call Touchstone for future electrical needs and will request Patrick & Mann; I recommend them highly. Thanks guys!
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Morrisville area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on June 19, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 1 project photo attached to this completed job.
