Level 2 EV Charger Installation in Piedmont, SC | Duke Energy Rebate completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation in Piedmont, SC | Duke Energy Rebate

EV Charging completed by Touchstone Electric in Piedmont.

PiedmontCompleted: June 19, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Project Overview

Installed a customer-supplied Level 2 EV charger in Piedmont, SC with 60A breaker, THHN wiring, 3/4 in EMT conduit, permit, and Duke Energy rebate support.

Customer feedback: EV charger install

Work Performed

  • Completed Level 2 EV Charger Installation under the EV Charging service category.
  • Served the Piedmont area with licensed Touchstone Electric electricians.
  • Verified the finished work for safe, code-conscious operation.
  • Documented the project as completed on June 19, 2026.

Project Record

  • Service category: EV Charging.
  • Project type: Level 2 EV Charger Installation.
  • 2 project photos attached to this completed job.