Completed Level 2 EV Charger Installation in Pendleton, SC
Service category: EV Charging — Level 2 EV Charger Installation
On August 7, 2026, our Greenville branch based in Taylors completed a customer-supplied Level 2 EV charger installation for homeowner Kalpak Patel in Pendleton, SC. Lead technician Tyler Harris installed a dedicated 60-amp circuit, routed approximately 20 feet of #6 SEU (3-wire) cable, and filed the required electrical permit for a safe, code-compliant home charging setup—all completed in a single scheduled visit.
This project provides reliable, faster at‑home charging capacity and positions the home for current and future EV needs.
Project details
- Customer-supplied Level 2 charger professionally installed and connected per manufacturer specifications.
- New 60A standard breaker added to the service panel to supply a dedicated 240V charging circuit.
- ~20 ft of #6 SEU (3-wire) feeder routed cleanly from panel to the charger location for proper ampacity on a 60A circuit.
- Electrical permit filed with the county to ensure inspection and compliance with current electrical codes.
- Single-visit installation for minimal disruption, with full testing and homeowner walk‑through at completion.
The 60A circuit provides ample capacity for many Level 2 chargers, supporting quicker charge times and stable performance.
Permitting and code compliance
Touchstone Electric handled the county electrical permit for this project so the installation aligns with local code and inspection requirements. Please note: jurisdictions can require additional non‑electrical permits depending on the property and scope. Our permit service here covers the electrical permit only. If Historic Preservation, Environmental/Septic, Zoning, Builder, or other non‑electrical permits are required, we’ll advise you on what’s needed and, upon request, provide pricing to process those additional permits.
Homeowner benefits for this Pendleton install
- Faster charging at home: Dedicated Level 2 capacity means convenient overnight top‑offs and reduced reliance on public stations.
- Safety and peace of mind: Properly sized breaker and conductor with a permitted hookup.
- Future‑ready capacity: A 60A circuit offers headroom for many current and next‑gen Level 2 chargers.
- Professional workmanship: Neat routing, labeling, and verification testing by a licensed technician.
Following completion, Kalpak Patel praised our team in their review of the service experience.
Our Level 2 EV charger installation process in Pendleton
- Assessment: Review charger requirements, panel capacity, and routing options.
- Permitting: File the electrical permit and coordinate inspection as required.
- Installation: Add the dedicated breaker, run appropriately sized wiring, and connect the charger per manufacturer specs.
- Testing & verification: Confirm correct voltage, connections, and charger functionality.
- Homeowner walkthrough: Go over usage tips, breaker labeling, and next steps for inspection (where applicable).
Local service from our Greenville branch
Touchstone Electric proudly serves Pendleton through our Greenville branch in Taylors. Whether you already have a charger or need guidance selecting one, our team provides code‑compliant, efficient installations tailored to your home and driving habits.
If you’re planning a Level 2 EV charger installation in the Pendleton area, our electricians can help you evaluate circuit sizing, placement, and permitting so you get a reliable, long‑lasting setup.
Ready for your own EV charging upgrade?
Schedule a Level 2 EV charger installation with Touchstone Electric and power up at home with confidence. Our Greenville team will handle the details—so you can plug in and drive.