Level 2 EV Charger Installation in Oak Ridge, NC (220V) completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation in Oak Ridge, NC (220V)

EV Charging completed by Touchstone Electric in Oak Ridge.

Oak RidgeCompleted: June 20, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Project Overview

Professional 220V hardwired Level 2 EV charger circuit installed with new 60A breaker, SEU #6 wiring, and permitting in Oak Ridge, NC. Fast, code-compliant.

Customer feedback: Chris Rogers did a fantastic job. Highly recommend!!!

Work Performed

  • Completed Level 2 EV Charger Installation under the EV Charging service category.
  • Served the Oak Ridge area with licensed Touchstone Electric electricians.
  • Verified the finished work for safe, code-conscious operation.
  • Documented the project as completed on June 20, 2026.

Project Record

  • Service category: EV Charging.
  • Project type: Level 2 EV Charger Installation.
  • 2 project photos attached to this completed job.