Level 2 EV Charger Installation in Mills River, NC | Rebate Ready completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation in Mills River, NC | Rebate Ready

EV Charging completed by Touchstone Electric in Mills River.

Mills RiverCompleted: July 17, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Project Overview

Professional Level 2 EV charger installation in Mills River, NC. New 60A breaker, 6/3 NM-B wiring run, permit handled, and Duke Energy rebate guidance for savings.

Work Performed

  • Completed Level 2 EV Charger Installation under the EV Charging service category.
  • Served the Mills River area with licensed Touchstone Electric electricians.
  • Verified the finished work for safe, code-conscious operation.
  • Documented the project as completed on July 17, 2026.

Project Record

  • Service category: EV Charging.
  • Project type: Level 2 EV Charger Installation.
  • 3 project photos attached to this completed job.