Project Overview
Professional Level 2 EV charger installation in Mills River, NC. New 60A breaker, 6/3 NM-B wiring run, permit handled, and Duke Energy rebate guidance for savings.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Mills River area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on July 17, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 3 project photos attached to this completed job.
