Level 2 EV Charger Installation in Mills River, NC
Touchstone Electric completed a professional Level 2 EV charger installation for Duke Energy - Allumia in Mills River, NC. This project was delivered by our Asheville team serving the area from our Hendersonville branch, with licensed technicians Alec Saikal and Frank Fragale leading the work. The installation was completed on July 17, 2026, and included full permitting, a new dedicated circuit, and rebate-ready documentation to help maximize savings through Duke Energy.
What We Installed
- Dedicated 240V circuit for a Level 2 EV charger (customer-supplied unit).
- New 60A two-pole breaker installed in the main panel for reliable charging capacity.
- Approximately 80 ft of 6/3 NM-B wire run from the panel to the charger location, with conduit used where required for protection and code compliance.
- 20A tandem breaker added to optimize panel space and maintain safe load distribution.
- Permitting and inspection coordinated to meet local and state electrical codes.
This setup delivers fast, dependable Level 2 charging while ensuring the electrical system is properly sized, labeled, and compliant.
Rebate-Ready With Duke Energy Guidance
We prepared the installation to align with Duke Energy program requirements and provided guidance on the steps needed to pursue available rebates. Our team supplies the documentation typically needed for rebate submissions and ensures the installation meets the specifications commonly requested by utility programs. If you are considering a similar EV charging project in Mills River, we can help you understand eligibility, documentation, and next steps with Duke Energy so you can capture potential savings.
Our Step‑By‑Step Approach
- Site assessment and planning: Verified panel capacity, selected the best routing for the 6/3 NM-B run, and determined mounting and connection details for the customer’s EV charger.
- Panel updates: Installed a 60A breaker dedicated to the charger and utilized a 20A tandem breaker to free space while maintaining proper circuit protection.
- Professional wiring: Pulled approximately 80 feet of 6/3 NM-B, using conduit where exposed or required, and secured all terminations to manufacturer and code standards.
- Device connection: Completed either a hardwired connection or receptacle installation per the charger’s specifications and the approved permit.
- Testing and verification: Performed final torque checks, labeling, and functional testing to confirm safe, reliable charging performance.
- Permits and inspection: Managed the permit process and arranged inspection to close out the project properly.
To keep the project efficient and on schedule, an electrical assistant supported the lead technicians with material handling, wire pulls, and cleanup.
Why Mills River Homeowners Choose Touchstone Electric
- Local expertise: Asheville-based team serving Mills River from our Hendersonville branch with deep knowledge of area codes and permitting.
- Rebate guidance: Clear direction on how to make your installation rebate-ready with Duke Energy.
- Code-compliant work: Proper breaker sizing, conductor selection, conduit protection, and labeling for safe, long-term performance.
- End-to-end service: We handle planning, permits, installation, testing, and inspection.
- Clean, professional results: Tidy wire management and a neat finish that complements your garage or installation space.
Serving Mills River and the Greater Asheville Area
If you’re ready to add a Level 2 EV charger at your home in Mills River, Touchstone Electric can help you plan the right circuit size, manage the permit, and prepare your project for potential utility rebates. Our experienced installers make charging at home simple, safe, and convenient—so you can plug in with confidence.
Contact Touchstone Electric to schedule your EV charger installation in Mills River or to learn more about rebate-ready options through Duke Energy.