Professional Level 2 EV Charger Installation in Midland, NC
Touchstone Electric recently completed a turnkey Level 2 EV charger installation in Midland, NC for Duke Energy - Allumia. Handled by our Charlotte team out of the Matthews branch, this project was finalized on August 25, 2026 and included full permitting and rebate support through the Duke Energy program. Lead technician Mark Alaev delivered a clean, code-compliant setup designed for reliable daily charging at home.
Project Overview and Scope of Work
Our team installed a dedicated 240V circuit to power a customer-supplied Level 2 EVSE, ensuring fast and dependable charging. The installation was built to meet current electrical codes and local inspection requirements while protecting the homeowner’s investment and their vehicle’s charging system.
- Dedicated 50A Circuit: Installed a new 50-amp breaker in the service panel for a robust Level 2 charging circuit.
- New 6/3 NM-B Wiring: Ran approximately 25 feet of 6/3 NM-B copper cable to deliver a safe, properly sized feeder to the EVSE location.
- 3/4 in. EMT Conduit: Added roughly 25 feet of EMT for neat, durable protection where the run was exposed.
- Customer-Supplied EV Charger: Professionally mounted and connected the Level 2 charger (EVSE) for optimal usability and safety.
- Testing and Commissioning: Verified voltage, amperage, GFCI and breaker operation, and performed start-up checks for reliable charging performance.
- Labeling and Documentation: Circuit labeling and photo documentation to streamline inspection and rebate submission.
Duke Energy Permit and Rebate Assistance
As part of this project, we coordinated the required Duke Energy permitting and inspection process from start to finish. Our office also assisted with the Duke Energy EV rebate submission, helping the customer navigate program requirements and required documentation. While rebate amounts and eligibility can vary, our team’s goal is to simplify the process so Midland homeowners can take advantage of available incentives with minimal effort.
- Guidance on eligibility and documentation
- Permit coordination and scheduling of inspections
- Photo and invoice packaging for rebate submission
Why This Setup Works for Most Home EV Owners
A dedicated 50A, 240V Level 2 circuit is a flexible solution for many popular EVs. It typically supports faster overnight charging than a standard 120V outlet, reduces charging time, and offers the convenience of waking up to a full battery. Using appropriately sized 6/3 NM-B wire and EMT conduit helps ensure long-term safety, neat routing, and durability in both finished and unfinished spaces.
Quality You Can Count On
Lead electrician Mark Alaev ensured the installation met electrical code and local inspection standards, with tidy workmanship and clear communication throughout. After completion, the customer shared positive feedback about the smooth process and professional installation experience.
Serving Midland from Our Matthews/Charlotte Team
Touchstone Electric proudly serves Midland and the surrounding area from our Matthews branch in the Charlotte region. Whether you’re installing your first Level 2 charger or upgrading an existing setup, our team is ready to help with load calculations, panel upgrades if needed, permitting, and rebate assistance.
Thinking About a Level 2 Charger in Midland?
If you’re considering a home EV charger, we can evaluate your panel capacity, recommend the right circuit size, and handle everything from materials and installation to inspection and rebate paperwork. Count on our Charlotte-based team for a safe, streamlined experience that gets you charging confidently at home.
