Project Overview
We installed a 50-amp dedicated circuit with PVC to NM-B transition, GFCI breaker, and EV-rated receptacle for Level 2 charging in Hillsborough, NC.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Hillsborough area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on August 11, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 4 project photos attached to this completed job.
