Level 2 EV Charger Installation in Easley, SC with Duke Rebate completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation in Easley, SC with Duke Rebate

EV Charging completed by Touchstone Electric in Easley.

EasleyCompleted: June 19, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Project Overview

Professional Level 2 EV charger install in Easley, SC. New 60A breaker, wiring and PVC conduit, permitted and Duke Energy rebate applied for big savings.

Customer feedback: After a brief, courteous introduction, Tyler got right to work. He needed to leave and get another part. Told us when he would return and was back when expected. Great service!

Work Performed

  • Completed Level 2 EV Charger Installation under the EV Charging service category.
  • Served the Easley area with licensed Touchstone Electric electricians.
  • Verified the finished work for safe, code-conscious operation.
  • Documented the project as completed on June 19, 2026.

Project Record

  • Service category: EV Charging.
  • Project type: Level 2 EV Charger Installation.
  • 1 project photo attached to this completed job.