Level 2 EV Charger Installation in Charlotte, NC | 60A Circuit completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation in Charlotte, NC | 60A Circuit

EV Charging completed by Touchstone Electric in Charlotte.

CharlotteCompleted: June 23, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Level 2 EV Charger Installation in Charlotte, NC

Touchstone Electric’s Charlotte team completed a professional Level 2 EV charger installation for Duke Energy - Allumia in Charlotte, NC. Led by technician Danny Bishop, this project delivered a safe, code-compliant 240V charging solution on a dedicated 60A circuit. Completed on August 21, 2025, the work included full permit handling and documentation to support Duke Energy rebate eligibility.

Project Overview

Our electricians installed a new 60-amp dedicated circuit engineered for reliable Level 2 charging performance. We evaluated panel capacity, added a properly sized breaker, and ran #6 SEU (3-wire) conductor to the charger location. A durable 4-11/16 junction box and Polaris lugs were used for secure terminations, and the customer-supplied EV charger was connected per manufacturer specifications.

All work was completed to current NEC and local code requirements, with clear labeling and thorough testing to verify correct voltage, grounding, and GFCI protections where applicable.

Scope of Work

  • On-site assessment, load calculation, and panel capacity check
  • Installation of a new 60A breaker dedicated to the EV charging circuit
  • Routing of #6 SEU (3-wire) conductor to the charger location for robust, low-resistance power delivery
  • Installation of a 4-11/16 junction box and Polaris mechanical lugs for secure, serviceable connections
  • Connection of the customer-supplied Level 2 charger per manufacturer and code requirements
  • Panel and circuit labeling, functional testing, and safety verification
  • Permit acquisition and coordination for inspection readiness in Charlotte, NC
  • Documentation support for Duke Energy EV rebate eligibility

Duke Energy Rebate and Permit Handling

This Level 2 EV charger installation was completed to meet the requirements for the Duke Energy rebate program. Our team handled the permitting process and provided the documentation typically requested for rebate submissions, helping streamline approval and reimbursement for qualifying work. By designing the installation around a 60A circuit with #6 SEU wiring, we aligned the project with utility and code expectations for safe, efficient home charging.

Why Charlotte Homeowners Choose Touchstone Electric

  • Local, licensed electricians from our Charlotte team
  • Code-compliant installations with clean workmanship
  • End-to-end service: assessment, breaker and wiring, testing, and permit handling
  • Familiarity with utility rebate requirements, including Duke Energy programs
  • Clear communication and respectful, tidy job sites

Results You Can Rely On

The finished system delivers dependable Level 2 charging performance, with a dedicated 60A circuit sized for today’s EVs and future-ready capacity. With correct wire sizing, secure terminations, and thorough testing, the homeowner gets faster charging, improved convenience, and peace of mind knowing the installation meets Charlotte’s permitting and inspection standards.

Reviewed on Google

The customer praised our work after completion. Read their feedback on Google: See the review.

Serving Charlotte, NC

Looking to install a Level 2 EV charger in Charlotte, NC? Touchstone Electric handles everything from load calculations and 60A circuit installation to permits and rebate documentation, so you can plug in with confidence.