Project overview
Touchstone Electric completed a professional Level 2 EV charger installation for Antonia Filippis in Charlotte, NC. On May 3, 2024, our Charlotte team, led by technician Ben Lively, installed a dedicated 50-amp circuit and connected the customer-supplied EV charging equipment. The work was permitted and scheduled for inspection to ensure full code compliance and long-term reliability.
This installation was coordinated through our Matthews branch serving the greater Charlotte area, delivering a clean, safe, and efficient charging solution tailored to the home’s electrical system.
Scope of work
- Dedicated 50A breaker: Installed a standard 50-amp breaker to power the Level 2 EV charger.
- Conduit run: Installed approximately 49 ft of 3/4 in PVC conduit, securely mounted and routed for a neat, low-profile finish.
- Properly sized conductors: Pulled THHN #6 conductors to support the EV charging load and minimize voltage drop over the run.
- Appliance hookup: Completed a major appliance installation to connect the customer’s EV charging equipment, including receptacle or hard-wired termination as appropriate.
- Permitting and inspection: Filed the electrical permit with the county and scheduled the required inspections.
- Savings applied: Membership discount, service call discount, and a Duke Energy rebate program credit were applied to the project.
The result is a dedicated Level 2 charging solution capable of faster, more dependable at-home charging for EV ownership in Charlotte, NC.
Why this setup works for Level 2 charging
- Faster charging at home: A 50A Level 2 circuit significantly reduces charge times compared to Level 1 (120V) charging.
- Safety and reliability: A dedicated breaker and correctly sized THHN #6 conductors help the system run cooler and more efficiently under load.
- Code-compliant installation: Permits and inspections provide peace of mind that the installation meets local and national electrical codes.
- Clean, durable pathway: PVC conduit protects wiring and keeps the run organized and accessible for future service.
- Future-ready capacity: The 50A circuit supports a wide range of current EV chargers and potential future upgrades.
Our Charlotte EV charger installation process
- On-site evaluation: We assess panel capacity, mounting locations, and the most efficient pathway for conduit and conductors.
- Permitting: We handle the electrical permit and coordinate inspection with the county.
- Professional rough-in: We install 3/4 in PVC conduit and pull THHN #6 conductors for a robust 240V circuit.
- Breaker installation and labeling: A dedicated 50A breaker is installed and clearly labeled for the EV circuit.
- Appliance connection and testing: We complete the charger hookup and verify operation under load.
- Rebate guidance: When applicable, we help customers take advantage of local utility incentives like Duke Energy programs.
Customer feedback
Following completion, Antonia Filippis praised our team in a post-project review, highlighting the professionalism and clear communication throughout the installation. (Google review share link not available.)
Serving Charlotte, NC
From our Matthews branch, Touchstone Electric installs Level 2 EV chargers across Charlotte, NC. Whether you need a new 50A circuit, a panel upgrade, or a clean conduit run to your parking location, our licensed electricians deliver efficient, code-compliant solutions to keep you charging confidently at home.
Considering a Level 2 EV charger in Charlotte? Our team can evaluate your panel, design the best route for conduit and wiring, pull permits, and handle the complete installation—so you can plug in and charge faster with peace of mind.
