Project Overview
Professional Level 2 EV charger installation in Cary, NC. Dedicated 50A GFCI breaker, THHN #6 wiring, conduit as needed, and Duke Energy permit/rebate assistance.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Cary area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on August 28, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 1 project photo attached to this completed job.
