Project Overview
Installed a customer-supplied Level 2 EV charger in Cary, NC with a new 60A breaker, SEU #6 wiring, conduit, and permit—qualifying for the Duke Energy EV rebate.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Cary area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on July 16, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 1 project photo attached to this completed job.
