Level 2 EV Charger Installation Completed in Arden, NC
Touchstone Electric completed a Level 2 EV charger installation for Duke Energy - Allumia in Arden, North Carolina. Our Asheville team provided the electrical infrastructure needed to support dependable at-home electric vehicle charging, with work completed by Johann Fischer and Frank Fragale.
A Level 2 charger can provide a practical, convenient charging solution for EV owners who want to charge at home with a properly sized dedicated circuit. Because EV charging equipment places a sustained demand on a home’s electrical system, professional installation is important for safe operation, code-conscious workmanship, and reliable performance.
What This EV Charging Installation Included
This project was completed for a customer-supplied EV charging unit. Touchstone Electric installed the supporting electrical components required for the charger connection during the scheduled visit, including the dedicated breaker, wiring, conduit, and permit coordination.
- Installation support for a customer-supplied Level 2 EV charger
- Dedicated 60-amp GFCI breaker
- Approximately 10 feet of #6 SEU wiring for the charging circuit
- PVC conduit and associated fittings for protected wire routing
- Required electrical permit for the installation
- Professional installation by Touchstone Electric’s Asheville-area team
Safe, Dedicated Power for Home EV Charging
Level 2 charging equipment should be connected to a dedicated circuit that is properly selected for the charger and the home’s electrical system. For this Arden project, the installation included a 60-amp GFCI breaker and #6 wiring to provide the needed circuit capacity for the planned charger setup.
Conduit was also used as applicable to help protect the electrical wiring and create a clean, durable installation path. Every home is different, so the exact route, wiring requirements, panel capacity, and equipment configuration can vary based on the charger location and existing electrical conditions.
Why Permit Coordination Matters
Electrical permits help ensure that qualifying work is documented and completed with the appropriate local requirements in mind. Including the required permit as part of this EV charger project supports a more complete installation process and helps homeowners move forward with greater confidence in their charging setup.
When planning an EV charger installation in Arden, it is helpful to work with an electrician who can evaluate the electrical panel, determine whether a dedicated circuit is needed, identify a practical wiring route, and install the equipment according to the needs of the home and charger.
Level 2 EV Charger Electricians Serving Arden
Touchstone Electric serves homeowners throughout Arden and the surrounding Asheville service area with residential electrical solutions, including Level 2 EV charger installations. Whether you are preparing for your first electric vehicle, replacing charging equipment, or need a dedicated circuit added for a new charger, our team can help identify the electrical work needed for a safe home charging setup.
Need EV charging installation in Arden? Touchstone Electric can help with dedicated circuits, breaker installation, wiring, conduit, and permit-related electrical work for customer-supplied Level 2 charging equipment.
