Professional Level 2 EV Charger Installation in Greenwood, SC
Touchstone Electric recently completed a Level 2 EV charger installation for homeowner Jeffrey Williams in Greenwood, SC. Handled by our Greenville branch team based in Taylors, licensed electrician Tyler Harris finished the job on 2026-08-25 with a permitted, code-compliant setup designed for reliable day-to-day charging.
Project Overview
We installed the customer-supplied Level 2 EV charger on the same wall as the garage subpanel for a clean, efficient layout. The run was approximately 15 feet near the garage-door entrance, minimizing wire length and allowing a neat conduit path while maintaining clearances.
- Panel: Square D Homeline garage subpanel
- Dedicated circuit: 50A breaker sized for a Level 2 EV charging load
- Conductors: THHN #6 copper, approximately 18 feet
- Raceway: 3/4 in. PVC conduit, approximately 15 feet with proper fittings and supports
- Appliance connection: Installed the customer-provided EV charger with either a dedicated receptacle or hard-wired connection per manufacturer requirements
- Permit: Electrical permit filed with the county and work performed to applicable code standards
This configuration provides dependable power delivery to the charger while protecting the home’s electrical system with appropriately sized overcurrent protection and conductors.
Why a 50A Level 2 Circuit Makes Sense
A dedicated 50A circuit offers headroom for many Level 2 chargers, supporting faster charging and helping reduce charge times compared to lower-amp options. Using THHN #6 conductors in a dedicated 3/4 in. PVC conduit gives a robust pathway for the load and a tidy, serviceable installation that’s easy to identify and maintain.
Locating the charger on the same wall as the panel also helps control installation costs by shortening the run and reducing the number of bends, while keeping the charger conveniently positioned for daily use.
Permits and Code Compliance
Our team obtained and filed the electrical permit for this Greenwood project and performed the work to meet local and national electrical codes. Please note that the included permit is for electrical scope only. If a project requires additional non-electrical permits (such as historic, environmental/septic, zoning, or builder-related permits), those are separate from the electrical permit and may involve additional steps or fees per the local jurisdiction.
Local EV Charger Experts Serving Greenwood
As a residential electrical contractor serving the Greenwood area from our Greenville branch, Touchstone Electric provides clean, safe, and properly sized Level 2 EV charger installations. We work with customer-supplied equipment and ensure the electrical infrastructure—breaker, wiring, and conduit—is matched to your charger’s requirements and installed to code.
- Dedicated circuits sized for your charger
- Neat, durable conduit runs and labeling
- Permitted work with attention to inspection requirements
- Friendly scheduling and clear communication
Customer Feedback
We’re grateful that Jeffrey Williams praised our work with a review. Read and share the feedback on Google: View Jeffrey’s review.
Plan Your Level 2 EV Charger Install in Greenwood
Whether you’re charging overnight or preparing for a new EV, our team can help you choose the right circuit size and placement for a clean, compliant installation. Contact Touchstone Electric’s Greenville branch to schedule service in Greenwood, and get a professional, permitted Level 2 setup that’s ready for everyday use.
