Level 2 EV Charger Installation in Greenville, SC | 50A Circuit completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation in Greenville, SC | 50A Circuit

EV Charging completed by Touchstone Electric in Greenville.

GreenvilleCompleted: June 23, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Completed Level 2 EV Charger Installation in Greenville, SC

On May 7, 2025, Touchstone Electric’s Greenville team completed a Level 2 EV charger install for Alex Harrington in Greenville, SC. Led by technician Tyler Harris, we added a dedicated 50-amp, 240-volt circuit to power the customer-supplied charger, delivering fast, reliable home charging with clean workmanship and code-compliant methods.

As a residential electrical contractor serving the Greenville area from our Taylors branch, we handle everything from planning and permitting to installation, testing, and rebate support—so homeowners can plug in with confidence.

Scope of Work

  • Site review to select a safe, convenient charger location and route.
  • Installed a new 50-amp breaker in the existing service panel for the EV circuit.
  • Pulled 6/3 NM-B wiring for a dedicated 240-volt Level 2 charging circuit.
  • Set a dedicated EV outlet and electrical box with proper fittings and strain relief.
  • Labeled the new circuit, torque-checked terminations, and verified voltage and polarity.
  • Apprentice wireman support ensured an efficient, tidy installation.

We coordinated closely with the homeowner to integrate the customer-supplied charger, minimize wall penetrations, and maintain a clean finish throughout the workspace.

Permitting and Code Compliance

Touchstone Electric pulled the required electrical permit and performed the installation to current NEC standards and local Greenville, SC requirements. The 50A breaker and 6/3 NM-B conductors are appropriately matched for a dedicated Level 2 EV charging load, helping ensure safe operation and capacity for years to come.

Electrical permitting for the EV circuit is included in our service. If a project calls for non-electrical permits (for example, zoning, historic, or environmental approvals), those are handled separately—we’ll identify what’s needed and guide you through next steps to keep your project moving.

Duke Energy EV Rebate Assistance

To help maximize savings, our team prepared and submitted the Duke Energy EV charger rebate for this installation. The rebate was applied to eligible materials and labor associated with the new EV circuit, reducing overall project costs. We provide the documentation and support you need to take advantage of available utility incentives in Greenville, SC.

Customer Feedback

Alex Harrington praised our team with a positive review following the installation. Read the review here: View the Google review.

Why Greenville Homeowners Choose Touchstone Electric

  • Specialists in Level 2 EV charger installation and 50A circuits.
  • Local Greenville electricians supported by our Taylors branch.
  • End-to-end service: site review, permitting, installation, testing, and rebates.
  • Clean, courteous workmanship and clear communication from start to finish.
  • Trusted, residential-focused electrical contractor serving Greenville, SC.

Plan Your Level 2 EV Charger Installation

If you’re in Greenville, SC and need a dedicated 50-amp, 240-volt circuit for a Level 2 EV charger, our Greenville team can help. We’ll assess your panel, handle permits, install the circuit and outlet, test everything, and assist with available utility incentives—so you can charge faster at home.