Level 2 EV Charger Installation in Charlotte, NC
Touchstone Electric’s Charlotte team, based out of our Matthews branch, completed a permitted Level 2 EV charging circuit for Duke Energy - Allumia in Charlotte, NC. The project was finished on November 25, 2024, by technician Danny Bishop. This installation was built to current electrical code and designed to meet the requirements for the Duke Energy EV rebate program.
What We Installed
To support fast, reliable home charging, our electrician installed a dedicated 240-volt circuit specifically for a Level 2 EV charger. Key components included:
- 60-amp breaker for a robust, future-ready EV charging circuit
- 4/3 NM-B Romex cable properly routed and secured for a safe, long-lasting installation
- Permit and documentation managed to ensure full compliance with local codes and rebate requirements
This setup is a great match for many Level 2 EV chargers, providing capacity for common 40–48 amp charging needs when paired with the manufacturer’s specifications and local code.
Permit-Backed, Code-Compliant Work
Every EV charging project we complete in Charlotte includes the proper permit and inspections as required. Our team follows the National Electrical Code along with local amendments to ensure safety, performance, and long-term reliability. From verifying panel capacity to installing a dedicated breaker and correctly sized conductors, we handle the details so you can charge with confidence.
Duke Energy EV Rebate Ready
This Level 2 EV charging circuit was designed to qualify for the Duke Energy EV rebate. We assist homeowners and program partners with the documentation needed to apply, helping streamline the path to approved rebates. If you are considering a home charger in Charlotte, our team can guide you through the process so your installation is completed right—and rebate ready.
Why Charlotte Homeowners Choose Touchstone Electric
- Local expertise: Charlotte electricians from our Matthews branch, focused on residential EV charging
- Transparent, permitted installations: We handle permitting and adhere to code on every job
- Future-ready solutions: Dedicated circuits sized for modern Level 2 chargers
- Clean, professional workmanship: Thoughtful routing, secure terminations, and clear labeling
Whether you’re adding your first EV charger or upgrading for faster charging, our team delivers a smooth, start-to-finish experience.
Customer Feedback
Our customer for this project, Duke Energy - Allumia, praised our work and shared their feedback. Read the review on Google: See the Google review.
Serving Charlotte, NC
Touchstone Electric proudly serves Charlotte, NC and nearby communities from our Matthews branch. If you need a Level 2 EV charger installation in Charlotte, we’re ready to help with permitting, code-compliance, and rebate support—so you can plug in with confidence.
