Level 2 EV Charger Installation in Asheville, NC | Duke Rebate completed by Touchstone Electric
Completed Project

Level 2 EV Charger Installation in Asheville, NC | Duke Rebate

EV Charging completed by Touchstone Electric in Asheville.

AshevilleCompleted: June 23, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Level 2 EV Charger Installation in Asheville, NC

Touchstone Electric completed a professional Level 2 EV charger circuit installation in Asheville, NC, supported by our Hendersonville branch and Charlotte business unit. Led by technician Wyatt Barnes, this project delivered a safe, code-compliant charging solution with full permitting and Duke Energy rebate assistance. Completed on January 15, 2025, the installation is a great example of our streamlined process for EV charging upgrades across the Asheville area.

Project Overview

For this job, our team installed a dedicated 240V circuit designed to power a customer-supplied Level 2 charger. To ensure reliable performance and future-ready capacity, we used a 60-amp configuration with appropriately sized conductors and protective devices. The customer for this project was Duke Energy - Allumia, and our scope included end-to-end service—from consultation and materials to permitting, testing, and documentation for rebate submission.

What We Installed

  • Dedicated 240V EV charging circuit designed for Level 2 charging
  • 60A standard breaker for ample charging capacity and reliable overcurrent protection
  • #6 SEU (3-wire) cable, approximately 20 feet, for a robust feeder run
  • 3/4-inch PVC conduit and fittings where required for protection and a clean finish
  • Professional terminations, labeling, and panel updates for clarity and safety
  • Full functionality testing and verification of charger operation on the new circuit

Every step followed current electrical code and manufacturer guidelines to help ensure dependable, long-term charging performance for the homeowner.

Permitting and Inspection

We secured the required electrical permit, coordinated with local authorities, and ensured all work was inspection-ready. Handling permitting in-house keeps projects on schedule and removes guesswork for homeowners. Our team also documented the installation details so that inspection and rebate processing would proceed smoothly.

Duke Energy Rebate Assistance

Touchstone Electric helped the customer navigate the Duke Energy EV charger rebate, managing the supporting documents and line items associated with the program. By assisting with the rebate application, we helped reduce the customer’s out-of-pocket costs and expedited the path from installation to reimbursement.

Who We Served

Customer: Duke Energy - Allumia
Location: Asheville, NC
Branch: Hendersonville (with support from our Charlotte business unit)
Technician: Wyatt Barnes
Completion Date: January 15, 2025

Why Asheville Homeowners Choose Touchstone Electric

  • EV charging expertise: We install dedicated Level 2 circuits sized for your vehicle and future needs.
  • Code-focused workmanship: Neat, professional installs with proper labeling and protection.
  • Permitting made easy: We handle the paperwork and schedule inspections.
  • Rebate guidance: Clear support for Duke Energy rebate submissions to help lower total project costs.
  • Local service: Proudly serving Asheville from our Hendersonville branch with regional support from Charlotte.

Customer Feedback

The customer praised our team for a smooth process, clean installation, and helpful rebate support. We appreciate the positive feedback and are committed to delivering the same high standard of service to homeowners throughout Asheville.

Ready for a Level 2 Charger in Asheville?

If you’re planning a Level 2 EV charger installation in Asheville, Touchstone Electric can help with circuit sizing, permitting, and rebate assistance. Contact our team to schedule an on-site assessment and get your home charging set up the right way.