Project Overview
Installed customer-supplied Level 2 EV charger with 6/2 NM-B wiring, spliced from existing outlet, and mounted new fixtures in Davidson, NC. Permit pulled.
Customer feedback: Chris was excellent. He replaced two breakers which were bad and helped us out with some outdoor receptacle repairs. All while enduring difficult conditions due to the weather. He kept us informed throughout as well.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Davidson area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on June 19, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 3 project photos attached to this completed job.