Project Overview
Professional Level 2 EV charger install in Arden, NC with panel load calc, new breaker, code-compliant wiring, and full permitting/inspections. Fast, reliable.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Arden area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on July 24, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 4 project photos attached to this completed job.