Project Overview
Level 2 EV charger install in Durham, NC with 50A GFCI breaker, 6/3 NM-B and THHN wiring, permitted work, and Duke Energy rebate help to lower costs.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Durham area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on July 10, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 6 project photos attached to this completed job.
