Level 2 EV Charger Circuit Installation in Gastonia, NC
Our Charlotte team, operating from our Matthews branch, completed a professional Level 2 EV charging circuit installation in Gastonia, NC for Duke Energy - Allumia. Led by technician Tyquan Johnson, the project was finalized on June 30, 2026 and designed to meet code requirements and qualify for the Duke Energy EV charger rebate program.
What We Installed
- Dedicated 240V Level 2 charging circuit purpose-built for a customer-supplied EV charger.
- 60-amp breaker installed in the main electrical panel to provide ample capacity for Level 2 charging needs.
- Approximately 30 feet of 6/2 NM-B (Romex) wiring, neatly routed from the panel to the charger location for a clean, reliable installation.
- Electrical permit secured to ensure the work complies with local code and utility program guidelines.
Whether the charger is hardwired or uses a compatible receptacle, our team ensures proper conductor sizing, breaker selection, and termination methods that align with manufacturer instructions and the National Electrical Code.
Duke Energy EV Rebate Readiness
This installation was planned to support eligibility for the Duke Energy EV rebate. Our scope included the essential elements typically requested by utility programs—like a dedicated circuit, properly sized overcurrent protection, and a permitted installation by a licensed contractor. We also provided the documentation customers commonly need for rebate submissions, such as permit and installation details.
While rebate terms can vary, we help Gastonia customers navigate the process by installing to program standards and offering guidance on what information to gather when applying. If you’re considering an EV charger, ask our Charlotte team about current utility incentives in your area.
Why Homeowners in Gastonia Choose Touchstone Electric
- Code-compliant workmanship with permits and attention to safety at every step.
- Load and capacity assessment to match the breaker and wiring to your EV charger’s requirements.
- Future-ready design that supports faster charging and potential EV upgrades.
- Neat, efficient routing for a clean finish and dependable performance.
- Local, responsive service from our Matthews branch serving the greater Charlotte area, including Gastonia.
Project Benefits
- Faster at-home charging compared to standard outlets, reducing charging time and increasing convenience.
- Safe, dedicated power that prevents overloading existing general-purpose circuits.
- Clear path to incentives by installing with the documentation and standards utility programs often require.
Every Touchstone Electric Level 2 installation focuses on performance, safety, and reliability—so you can plug in with confidence.
Customer Feedback
Our customer praised the team for their work on this project. Read the review on Google: View the Google review.
Serving Gastonia and the Greater Charlotte Area
Touchstone Electric provides EV charging solutions throughout Gastonia and nearby communities. From load evaluations to permit-ready installations, our Charlotte team is ready to help you power your EV at home with a professional Level 2 charger setup.
Thinking about a Level 2 charger in Gastonia? Our local electricians can assess your panel, plan the route, secure the permit, and complete a clean, code-compliant install that aligns with utility program expectations.
