Project Overview
Touchstone Electric installed a 50-amp GFCI-protected Level 2 EV charger circuit in Greenville, SC, including 6/3 wiring, permitting, and whole-home surge protection.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Greenville area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on November 18, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 1 project photo attached to this completed job.
