Project Overview
Level 2 EV charging circuit installed in Waxhaw: 50A GFCI breaker, attic run, underground Sch 80 to wood post with WP box; trench, inspection, backfill done.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Waxhaw area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on July 29, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 3 project photos attached to this completed job.