Project Overview
In Charlotte, we replaced two kitchen GFCIs, upgraded an ungrounded bathroom outlet to GFCI, and prepped for a Level 2 EV charger with Duke rebate assistance.
Customer feedback: Danny Bishop did a great job Had to climb in our attic to make the repair and it was not easy access. Was timely polite and knowledgeable
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Charlotte area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on June 20, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 7 project photos attached to this completed job.
