Level 2 50A EV Charger Installation & Duke Rebate in Zebulon, NC completed by Touchstone Electric
Completed Project

Level 2 50A EV Charger Installation & Duke Rebate in Zebulon, NC

EV Charging completed by Touchstone Electric in Zebulon.

ZebulonCompleted: April 15, 2026
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Level 2 EV Charger Installation in Zebulon, NC

Our Raleigh team completed a clean, code-compliant Level 2 EV charger installation for Duke Energy - Allumia in Zebulon, NC. On April 15, 2026, Jared Mata installed a dedicated 240V, 50-amp circuit to power the customer-supplied charger, handled permitting, and prepared documentation to support the customer’s Duke Energy rebate application.

  • Location: Zebulon, NC
  • Service category: EV Charging – Level 2 EV Charger Installation
  • Branch: Raleigh
  • Technician: Jared Mata
  • Permit: Pulled and coordinated by Touchstone Electric

What We Installed

To ensure safe, reliable Level 2 charging, we provided a dedicated circuit and protective equipment tailored to the charger’s continuous load requirements and current electrical code.

  • 50A GFCI breaker: Ground-fault protection enhances safety for EV charging and aligns with current electrical standards.
  • New 240V circuit with 6/3 NM-B: Approximately 20 feet of 6/3 NM-B cable was installed from the service panel to the charger location for a robust 50-amp supply.
  • Charger connection: The customer-supplied Level 2 charger was properly connected and function-tested on its dedicated 50A circuit.
  • Labeling and verification: Circuit labeling and operational checks help ensure long-term safety and convenience.
  • Permit handling: Our Raleigh branch managed the permitting process for a smooth, compliant installation experience.

This setup supports faster at-home charging while protecting the system with GFCI technology and a purpose-built circuit sized for Level 2 demand.

Duke Energy Rebate Assistance

We assisted the customer with the Duke Energy EV charger rebate by providing itemized documentation and permit details commonly required for submission. Our team is familiar with utility rebate steps and helps homeowners gather the paperwork they need to apply confidently. While rebate eligibility and amounts are determined by the utility, our goal is to make the process as straightforward as possible.

  • Itemized scope and materials summary prepared for rebate needs
  • Permit details included to support compliance requirements
  • Clear documentation of the 50A circuit, GFCI protection, and installation date

Why Homeowners in Zebulon Choose Touchstone Electric

  • Local expertise: Performed by our Raleigh branch for fast response in Zebulon, NC.
  • Code-compliant installations: Dedicated circuits, GFCI protection, and permitting handled start to finish.
  • EV-focused guidance: We help you understand charger requirements, panel capacity, and placement.
  • Rebate-ready documentation: We provide clear, organized paperwork to support utility rebate applications.

Whether you have a customer-supplied unit or need help selecting equipment, we’ll build the right circuit and protections for dependable Level 2 charging at home.

Customer Feedback

Our customer praised our work with a public Google review. View it here: Read the review on Google.

Ready for a Level 2 Charger in Zebulon?

If you’re in Zebulon, NC and need a Level 2 EV charger installed, Touchstone Electric’s Raleigh team can help. We’ll assess your setup, install a dedicated 240V circuit with the correct breaker and wire size, manage permits, and provide documentation to support applicable rebates. Reach out to schedule your installation and start charging faster at home.