Fort Mill, SC Level 2 EV Charger Install & Panel Upgrade completed by Touchstone Electric
Completed Project

Fort Mill, SC Level 2 EV Charger Install & Panel Upgrade

EV Charging completed by Touchstone Electric in Ft. Mill.

Ft. MillCompleted: November 6, 2025
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

EV Charger and Panel Upgrade in Fort Mill, SC

Our Charlotte branch, based out of Matthews, helped homeowner Marlene Keene in Fort Mill, SC get ready for faster at-home charging with a professional Level 2 EV charger installation and a full main service panel upgrade. Led by technician Chris Rogers, the project delivered dependable power for a 50-amp EV circuit, new lighting, and safer, code-compliant electrical distribution throughout the home.

What We Installed

  • Level 2 EV Charger (50A) Installation — We installed the customer-supplied charger on a dedicated 50-amp circuit for reliable Level 2 charging performance. The run was properly sized and protected, and we added a new 50-amp breaker for the EV load.
  • 200A Outdoor Main Panel Upgrade — We replaced the existing main panel with a new 200-amp outdoor panel to increase capacity and improve overall system safety. The panel was neatly labeled, grounded and bonded, and prepared for present and future household loads.
  • New Breakers for Safety and Code Compliance — The upgrade included a mix of new standard and GFCI breakers, including 15A and 20A branch circuit protection, 30A double-pole breakers for larger loads, and a dedicated 50A breaker for the EV charger.
  • Four New Light Fixtures — We installed four customer-supplied fixtures on existing boxes/circuits to refresh lighting with a clean, finished look.
  • Permitting and Inspection — Our team handled the permit and coordinated inspection to help ensure a smooth, compliant installation from start to finish.
  • Duke Energy EV Rebate Assistance — We supported the homeowner with the Duke Energy EV rebate process to help maximize available program savings.

Why Upgrade the Panel for EV Charging?

Level 2 charging draws significant continuous current. Upgrading to a 200-amp main panel gives the home the capacity headroom to safely support EV charging alongside HVAC, kitchen appliances, and other modern loads—without frequent nuisance trips or overtaxing older equipment.

  • Capacity for Today & Tomorrow — Room for the EV charger plus future projects like appliances, a workshop circuit, or additional lighting.
  • Better Protection — Updated breakers, including GFCI where required, help reduce shock risk and improve overall electrical safety.
  • Code-Ready — A modern panel arranged and labeled to align with current electrical code and local inspection standards.
  • Reliability — New equipment helps stabilize voltage and distribution for consistent, dependable performance.

Permits, Inspection, and the Duke Energy Rebate

Touchstone Electric managed the permitting and inspection process for this Fort Mill project so the homeowner could enjoy a seamless experience. Our team also assisted with the Duke Energy EV rebate paperwork to help the customer capture eligible incentives tied to EV charging upgrades. If you’re in Fort Mill, SC and considering Level 2 charging, we can walk you through the same steps—from application to final inspection.

Customer Experience

After completion, Marlene Keene praised our team with a positive review, noting the professional installation and smooth process. From first visit to inspection sign-off, we aimed to make this upgrade simple, safe, and future-ready.

Your Local Fort Mill EV Charging Pros

As a residential electrical contractor serving Fort Mill from our Charlotte team in Matthews, Touchstone Electric delivers turn-key Level 2 EV charger installs and panel upgrades that are neat, code-compliant, and built for long-term performance. Whether you’re adding your first charger or expanding capacity for a growing household, we can evaluate your service, recommend the right solution, and handle everything—including permits and rebate guidance.

Ready for faster at-home charging in Fort Mill, SC? Contact Touchstone Electric’s Charlotte team to schedule your EV charger installation and panel evaluation.