Fletcher, NC Level 2 EV Charger Installation | Duke Rebate completed by Touchstone Electric
Completed Project

Fletcher, NC Level 2 EV Charger Installation | Duke Rebate

EV Charging completed by Touchstone Electric in Fletcher.

FletcherCompleted: January 16, 2025
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Professional Level 2 EV Charger Installation in Fletcher, NC

On January 16, 2025, Touchstone Electric completed a code-compliant Level 2 EV charger installation in Fletcher, NC for Duke Energy – Allumia. Led by technician Tyler Harris, our Hendersonville-based team delivered a safe, reliable charging solution designed for everyday convenience and long-term performance.

Whether you’re upgrading to faster home charging or preparing for a new EV, our electricians handle everything—from permitting and materials to final testing—so you can plug in with confidence.

Scope of Work and Materials

For this Level 2 installation, we provided a dedicated 240V circuit and ensured the electrical infrastructure meets current code and manufacturer requirements. Key elements included:

  • Dedicated Level 2 charging circuit protected by a 50-amp breaker
  • Approximately 30 feet of #8 SEU (3-conductor) wiring routed in protective conduit for durability and a clean finish
  • Secure terminations and professional panel labeling for clarity and safety
  • Integration with the customer-supplied EV charging equipment (hardwired or receptacle as required by the equipment)
  • Electrical permit secured and inspection coordination for a fully compliant setup

Every installation is planned around the home’s electrical capacity and adheres to the National Electrical Code and local building standards in Fletcher.

Duke Energy EV Rebate Support

Touchstone Electric is experienced with utility-backed charging programs, including Duke Energy initiatives. For this project, we aligned the installation with program requirements and supplied the documentation needed for a smooth rebate process—helping reduce out-of-pocket costs for the customer.

If you’re interested in a Level 2 charger in Fletcher, ask our team about current utility incentives and how we can streamline your application from start to finish.

Safety, Testing, and Peace of Mind

Your charging circuit is only as reliable as the planning behind it. Our process includes a load check, proper conductor sizing, secure terminations, bonding and grounding verification, and thorough functional testing of the EVSE after installation. We also label the new circuit at the panel for easy identification and future service.

The result is a clean, professional installation that’s built to perform—day after day—without tripping breakers or stressing your panel.

Why Fletcher Homeowners Choose Touchstone Electric

  • Local expertise: Hendersonville team proudly serving Fletcher, supported by our Charlotte business unit
  • Turnkey service: permitting, materials, installation, and inspection coordination handled for you
  • Neat workmanship: tidy conduit runs, clear labeling, and attention to detail
  • Clear communication: scheduling that works for you and a helpful walkthrough upon completion

Following this project, the customer praised our work with a positive review—another reflection of our commitment to quality and service.

Plan Your Level 2 Charger Installation in Fletcher

Ready for faster home charging? Whether you need a NEMA receptacle for a portable EVSE or a fully hardwired unit, Touchstone Electric can evaluate your panel, recommend the best approach, pull the permit, and complete a clean, code-compliant installation.

Contact Touchstone Electric to schedule your Level 2 EV charger installation in Fletcher, NC. Our licensed electricians will help you charge confidently, safely, and efficiently—backed by local expertise and utility program know-how.