Charlotte Level 2 EV Charger Install with 50A Breaker & Permit completed by Touchstone Electric
Completed Project

Charlotte Level 2 EV Charger Install with 50A Breaker & Permit

EV Charging completed by Touchstone Electric in Charlotte.

CharlotteCompleted: November 11, 2025
Service TypeEV Charging
Project TypeLevel 2 EV Charger Installation
Work StandardCode compliant
Performed ByLicensed electricians
Call 855-502-2244

Level 2 EV Charger Install in Charlotte, NC

Touchstone Electric completed a Level 2 EV charger installation for Duke Energy - Allumia in Charlotte, NC, on November 11, 2025. Led by technician Christian Cedillos from our Charlotte branch, this project delivered a safe, code-compliant 240V circuit with a 50A breaker, a short run of 6/3 NM-B cable, and a convenient receptacle mounted beside the main electrical panel.

This job was designed for a customer-supplied EV charging unit, ensuring a clean, reliable connection that supports faster home charging and future vehicle upgrades.

What We Installed

  • Dedicated 240V Level 2 EV charging circuit sized for modern EVs and future capacity.
  • New 50A two-pole breaker installed and properly labeled in the existing panel.
  • Approximately 10 feet of 6/3 NM-B cable routed from the panel to the charging location.
  • Heavy-duty EV charging receptacle positioned beside the electrical panel for a neat, direct connection.
  • Customer-supplied EV charger accommodated, with testing, verification of polarity and torque, and final function check.

The short, direct run minimizes clutter and supports consistent charging performance, while leaving flexibility to upgrade to a hardwired EVSE later if desired.

Permitting, Code, and Inspection-Ready Work

Our team filed the electrical permit with the county and completed the installation to current electrical code requirements. We coordinate with local inspectors so your project is inspection-ready and properly documented.

Note: The permit covered for this project is the electrical permit only. If a jurisdiction requires additional non-electrical permits (such as zoning or historic), those are separate and handled as needed based on local rules.

Duke Energy Rebate Applied

To help lower the cost of going electric, Touchstone Electric assisted with the Duke Energy EV Charger Rebate. For this Charlotte installation, the rebate was successfully applied to eligible materials and labor related to the new 240V circuit. The customer’s out-of-pocket responsibility was limited to items not covered by the program (such as permitting).

If you’re in the Charlotte service area, ask us about current utility rebates and incentives for Level 2 EV charger installs. We can help you navigate eligibility and submission so you don’t leave savings on the table.

Benefits of a Proper Level 2 Setup

  • Faster charging compared to standard 120V outlets, typically providing a full overnight charge.
  • Dedicated, safe circuit sized for EV loads and protected by the correct breaker.
  • Future-ready capacity for higher-amp vehicles and potential charger upgrades.
  • Clean installation beside the panel to reduce cable clutter and simplify maintenance.
  • Code-compliant work with a filed permit and professional testing for peace of mind.

Reviewed by the Customer

Duke Energy - Allumia praised our team for the work on this project. You can view their feedback here: Read our Google review.

Serving Charlotte from Our Matthews Branch

Touchstone Electric proudly serves Charlotte, NC, and the surrounding metro area. From our Matthews branch, we deliver prompt scheduling, clear communication, and high-quality workmanship on EV charging projects of all sizes.

Ready to add a Level 2 EV charger at your home in Charlotte? Our licensed electricians can plan the right circuit size, file the permit, install the 50A breaker and 6/3 NM-B run, and help with available rebates—so you can charge faster, safer, and smarter.