Project Overview
Level 2 EV charger installed in Apex, NC with new #6 wiring, 50A GFCI breaker, permit, and Duke Energy rebate—safe, code-compliant work for faster home charging.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Apex area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on September 8, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 4 project photos attached to this completed job.
