50 Amp Level 2 EV Charger Outlet Installation in Charlotte, NC
Our Charlotte team from the Matthews branch completed a Level 2 EV charging upgrade for Duke Energy - Allumia in Charlotte, NC. On December 5, 2025, technician Christian Cedillos installed a dedicated 50 amp EV charging outlet beside the electrical panel and future-proofed the circuit with heavier-gauge wiring to support a potential 60 amp hardwired charger later on. A county electrical permit was filed for this project.
Project overview
This installation was designed to provide immediate Level 2 charging convenience while preparing the home’s electrical infrastructure for higher-capacity charging equipment down the road. Placing the outlet adjacent to the panel kept the run efficient and clean, minimized wall penetrations, and ensured a tidy, code-compliant finish.
What we installed
- Dedicated 50A EV charging receptacle located beside the main electrical panel
- New 50A breaker installed and clearly labeled for the EV charging circuit
- Heavier-gauge wiring (oversized for the current load) to support a future 60A hardwired charger
- County electrical permit filed and closed out per local requirements
By using heavier conductors than required for a standard 50A receptacle, the circuit is ready for a potential upgrade to a 60A hardwired Level 2 charger without the need to open the walls again or replace the wiring.
Future-ready wiring for faster charging
Many homeowners in Charlotte are moving from plug-in EV chargers to higher-output hardwired models. Oversizing the wiring during the initial installation keeps your options open and helps avoid additional labor later. If and when the customer opts to upgrade, our team can simply install the appropriate breaker and hardwired unit (subject to load considerations and permitting), saving time and disruption.
Permitting and code compliance
Touchstone Electric filed the electrical permit with the county and performed the work to meet local code requirements. Please note: only the electrical permit was included for this job. If a project requires other permits, such as Historic Preservation, Environmental/Septic, Zoning, separate subcontractor, or builder-related permits, those are not included. If additional permits are needed, we will advise on what is required and provide pricing if you would like us to process those on your behalf.
Duke Energy EV rebate considerations
The installation qualified for a Duke Energy EV rebate line item, helping to offset eligible materials and labor associated with the EV charging circuit. Program eligibility and requirements can change, so we guide customers on current criteria and documentation to help maximize available incentives.
Service area
This project was completed in Charlotte, NC by our Charlotte business unit, with support from our Matthews branch. We install and upgrade Level 2 EV charging solutions throughout the greater Charlotte area.
Customer feedback
After completion, the customer shared positive feedback about the installation experience. We appreciate the review and the opportunity to support EV charging growth in Charlotte.
Why choose Touchstone Electric for EV charging in Charlotte?
- Local, permit-ready installations performed to code by trained residential electricians
- Future-ready designs that consider your next charger upgrade
- Clear scope, labeling, and a neat, panel-adjacent finish
- Guidance on current utility rebates and program requirements
If you are considering a Level 2 charger or planning for a higher-capacity hardwired unit, our team can assess your panel, design the right circuit, and handle the permitting for a smooth, compliant installation.