Project Overview
Installed a dedicated 50-amp EV charging circuit and NEMA 14-50 outlet in a Wake Forest garage, routed safely from the outdoor meter panel through the crawlspace.
Customer feedback: Francisco Martinez was excellent--thorough, skilled and clear in his explanation of what his plan was to accomplish what we needed. He was careful to to prevent any cosmetic damage to our walls and was able to hide the conduit we needed for the outdoor receptacle for our new patio awning. We were kept informed throughout the whole process from the accurate estimate until completion.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Wake Forest area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on November 3, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 3 project photos attached to this completed job.