Project Overview
Installed a dedicated 50-amp EV charging circuit and NEMA 14-50 outlet in a Wake Forest garage, routed safely from the outdoor meter panel through the crawlspace.
Work Performed
- Completed Level 2 EV Charger Installation under the EV Charging service category.
- Served the Wake Forest area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on November 3, 2026.
Project Record
- Service category: EV Charging.
- Project type: Level 2 EV Charger Installation.
- 3 project photos attached to this completed job.