200A Meter Panel Combo and Barn Panel Installation in Matthews, NC
Our Charlotte team completed a code-compliant service upgrade for a barn in Matthews, NC. Led by technician Danny Bishop, the project included installing a 200 amp meter/panel combination at the back of the barn and a 200 amp main lug interior panel to power current needs and support future expansion. Completed on April 27, 2026, this upgrade delivers safe, reliable capacity for an outbuilding with growing electrical demands.
Project Highlights
- 200A Meter/Panel Combo (over/under, feed-through lugs): New meter/panel assembly installed at the barn, providing ample capacity and streamlined service equipment.
- Utility coordination: We scheduled the temporary power drop with the power provider and managed the outage window to minimize disruption.
- Grounding system: Installed ground rods with grounding electrode conductors for a safe, compliant grounding and bonding path.
- 200A Main Lug Interior Panel: A new indoor panel was furnished and installed in the barn, labeled and prepared to support future circuits and equipment.
- Permits and inspection: All required permitting was handled by our team, with final inspection included to verify code compliance.
What Was Included
- Meter/panel combo installation and equipment setup
- Grounding and bonding to current code
- Coordination with the utility for service shutdown and restoration
- Interior 200A main lug panel installation, labeling, and preparation for future circuits
- Permitting and inspection management
Need limited power during a planned outage? Touchstone Electric can make a generator available upon request to keep essential loads running while work is underway.
What This Scope Did Not Include
- Riser/weatherhead
- New breakers beyond the scope of the installation
- Service entrance cable from the new meter to the weatherhead
- Feeder and conduit to additional main panels (if required)
- Service disconnect or separate meter upgrade beyond the listed installation
If any of these items are needed for your property, our team can assess and provide a plan tailored to your setup.
Code Updates and AFCI Notes
As inspectors continue implementing NEC 2020 requirements, certain circuits may need AFCI protection. Adding or upgrading to AFCI breakers can reveal preexisting wiring issues—such as shared neutrals—that may cause nuisance tripping. Resolving these issues can require targeted diagnostics to locate and correct the affected circuits. Our team will explain findings and next steps so you know exactly what to expect.
Built for Today and Ready for Tomorrow
A 200A service is a smart choice for barns and outbuildings that support tools, lighting, EV charging, well pumps, climate control, or future expansions. With the meter/panel combo and interior main lug panel in place, this Matthews property now has a safe, scalable foundation for present and future electrical needs.
Local Expertise in Panels and Service Upgrades
Touchstone Electric specializes in Panels & Service Upgrades and Meter Base & Service Replacement across Matthews, NC. From permitting to final inspection, our Charlotte branch delivers smooth, code-compliant installations designed for safety, reliability, and long-term performance.
Customer Review
Alan Todd praised our team for this project. Read their feedback on Google: View the review.