Project Overview
In Hope Mills, we upgraded the main panel to 200A, added whole-home surge protection, replaced breakers, and installed a Level 2 EV charger with permit & inspection.
Customer feedback: Brad arrived half an hour earlier than the estimated arrival time at the residency. He thoroughly went through every room and checked outlets, light switches, overhead light fixtures etc. When completing the diagnostic, he thoroughly explained what was going on with my electrical issues and what would be the best solution to fix them.
Work Performed
- Completed Electrical Panel Upgrades under the Panels & Service Upgrades service category.
- Served the Hope Mills area with licensed Touchstone Electric electricians.
- Verified the finished work for safe, code-conscious operation.
- Documented the project as completed on June 22, 2026.
Project Record
- Service category: Panels & Service Upgrades.
- Project type: Electrical Panel Upgrades.
- 2 project photos attached to this completed job.